600-700t/h iron ore crushing plant project report

Processing materials: Iron ore

Capacity: 600-700t/h

Project case details:
Iron ore materials with less than 1020mm are sent into vibrating feeder, and then sent into jaw crusher  evenly by vibrating feeder. Jaw crusher is as primary crushing to process materials into 150mm–300mm. The materials are sent into cone crusher by vibrating feeder for secondary crushing. The crushed materials are screened by vibrating screen. The larger than 40mm materials are returned to cone crusher for crushing, and the less than 40mm materials are sent into sand making machine for shaping by belt conveyor.

600-700th iron ore crushing plant project report

Equipment configuration:
PE1200x1500 *1 jaw crusher,
HPC400 *2 hydraulic cone crusher,
5X1145 *2 sand making machine,
GZD1500×6000 *1 vibrating feeder,
YZS2160 *3 circular vibrating screen,
and belt conveyor, electronic control equipment etc.