700-800 tons per hour of limestone production line solutions

700-800 tons per hour of limestone production line s Introduction:

700-800 tons per hour of limestone crushing equipment, stone blasting from the mountains down into the feeder by dump truck will be less than 1020mm of stone, the stone vibrating feeder evenly into the jaw crusher, jaw crusher to carry out the first paragraph of broken stone, from stone jaw broken out in the 150mm-300mm or so, by vibrating feeder material into the European version of the back-breaking second paragraph were crushed by circular vibrating screen for screening of material grading, greater than the finished material back into back-breaking re-broken, finished transported by belt conveyor to the finished product area.
700-800 tons per hour of limestone production line solutions

All kinds of Limestone production line crushing and auxiliary equipment used:

Feeder GZD1500 × 6000 1 station

Jaw crusher PE-1200 × 1500 1 station

Feeder GZD1300 × 4900 2 units

European type jaw crusher PFW1318 4 sets

Circular vibrating screen 4YZS2460 4 sets

If desired, the LIMING company technical manager will give you detailed technical guidance, and on-site installation guide.

This entry was posted in Accessory Equipment, Limestone Crusher, Solutions and tagged . Bookmark the permalink.