700-800 tons per hour of limestone production line s Introduction:
700-800 tons per hour of limestone crushing equipment, stone blasting from the mountains down into the feeder by dump truck will be less than 1020mm of stone, the stone vibrating feeder evenly into the jaw crusher, jaw crusher to carry out the first paragraph of broken stone, from stone jaw broken out in the 150mm-300mm or so, by vibrating feeder material into the European version of the back-breaking second paragraph were crushed by circular vibrating screen for screening of material grading, greater than the finished material back into back-breaking re-broken, finished transported by belt conveyor to the finished product area.
All kinds of Limestone production line crushing and auxiliary equipment used:
Feeder GZD1500 × 6000 1 station
Jaw crusher PE-1200 × 1500 1 station
Feeder GZD1300 × 4900 2 units
European type jaw crusher PFW1318 4 sets
Circular vibrating screen 4YZS2460 4 sets
If desired, the LIMING company technical manager will give you detailed technical guidance, and on-site installation guide.